Mawson West Ltd

INVESTOR FACT SHEET

Potential For Significant Growth in Copper Resources

Mawson West Limited (TSX:MWE) is a copper producer, developer and explorer with a focus on the Democratic Republic of Congo (DRC). MWE owns 90% of the Dikulushi Mining Convention and has one operation at Dikulushi and one mine in construction at Kapulo. Exploration continues on the 7,200km2 tenement package.

Kapulo

  • Construction commenced
  • Mineral Resource (Shaba & Safari N&S)
    • Indicated - 6.0Mt @ 3.5% Cu, Inferred - 2.4Mt @ 2.2% Cu
  • Reserve (Shaba open cut only): 3.6Mt @ 3.6% Cu (at $2.50/lb Cu)
  • Operating cash cost: $1.79/lb Cu
  • NPV at 10%: $157M
  • Pre-tax free cash: $305M
  • $70M estimated capex
  • Pay back under 2 years
  • IRR 66%

Dikulushi

  • Currently treating low-grade stockpiles. Producing 400t Cu & 35koz Ag per month
  • Exploration within 50km of mine - numerous high-priority targets require drilling
  • Mineral Resource: Measured & Indicated - 767kt @ 6.6% Cu & 179g/t Ag
    • Inferred - 380kt @ 6.8% Cu & 91g/t Ag
  • Reserve (Cutback): 539kt @ 6.1% Cu & 182g/t Ag (at $3.50/lb Cu & $30/oz Ag)
  • Pre-strip 12 months - $61MM, paid back in under 12 months
  • Operating cash cost (net of silver) - $0.10/lb Cu
  • NPV at 10%: $116MM (at $3.50/lb Cu & $30/oz Ag)
  • Pre-tax cashflow: $146MM
  • IRR: 128%

Development

  • Plant construction underway at Kapulo
  • Open pit mines to be developed on two initial deposits Shaba and Safari North
  • Feasibility study initiated for hydro scheme
  • Pit cutback commenced at Dikulushi

Management

  • Strong title - Dikulushi Mining Convention signed under Presidential decree 1998
  • Conservative experienced Management and Board
  • The Company maintains regular high level communication with provincial government
  • Well funded, DRC experienced, private shareholder group, Anvil, large institutions,
  • banks, and Management as shareholders.

Kapulo Project Timeline

kapulo project timeline

EXPLORATION

overview overview

Overview

Northern Katanga Basin, Democratic Rep. Of Congo
  • Outboard of the Copperbelt, but shares the Katanga Basin geological environment
  • Stratabound, fault-hosted and hybrid Cu-Ag deposits
  • Widespread supergene upgrading = high grade shallow resources and simple metallurgy
Large under-explored - 7,200km2 land package Balanced Project pipeline
  • 2 drill ready major targets
  • 8 drill ready satellite targets
  • 11 untested regional occurences and surface geochemical anomalies
  • 3,000km2 remaining for first-class reconnaissance
overview overview

Kapulo District

Kapulo Fault
  • >40km strike basin growth fault, hosts Shaba and Safari deposits
  • Multiple oil Cu anomalies
  • CSAMT survay 2010 (Zonge) shows Kapulo deposits easily recognised as geophysical conductors
  • 5 new, distinct, conductive targets
Regional drainage chemistry program
  • 50% of area covered; 10 new targets
  • 1 virgin discovery of Cu minerals in outcrop over 1km strike
  • 2 Cu-smelting sites discovered in 'new' areas
overview overview

Dikulushi District

  • Fault-hosted sulfide deposits with supergene upgrading
  • Major ( >2km strike length) soil geochemicaltargets for evaluation(Kiankalamu, Kaswete, Kinkumbi)
  • Multiple Dikulushi satellite targets; (Kazumbula, Boomgate, Golf Bore); first-phase ore intercepts at Kabusanje, Kazumbula Sth, 6 others awaiting testing
  • High target-to-discovery conversion rate
  • Follow up and drilling scheduled 2011
  • Soil chemistry programs ongoing
Download PDF